{"id":3943,"date":"2014-10-22T16:35:05","date_gmt":"2014-10-22T16:35:05","guid":{"rendered":"http:\/\/www.dev.terre-armee.com\/?p=3943"},"modified":"2020-01-10T18:58:04","modified_gmt":"2020-01-10T18:58:04","slug":"when-terre-armee-delivers-reinforced-earth-walls-for-the-winter-olympics","status":"publish","type":"post","link":"https:\/\/www.terre-armee.com\/when-terre-armee-delivers-reinforced-earth-walls-for-the-winter-olympics\/","title":{"rendered":"When Terre Arm\u00e9e delivers Reinforced Earth walls for the Winter Olympics"},"content":{"rendered":"
In the area of PK-325, at 32.5 km railroad mark, both highway and railway come close together resulting in a geotechnical interaction with each other, so that in this location the construction of a vertical retaining wall was necessary.<\/p>\n
Bewehrte Erde\u00a0(Reinforced Earth in Germany) was commissioned for the final execution design and delivery of around\u00a05,320 m\u00b2 of retaining walls with TerraClass\u00ae<\/sup> panels in combination with HA GeoStrap\u00ae<\/sup> synthetic strips.<\/p>\n More about:<\/strong>
\nRoads & Motorways<\/a><\/p>\n<\/div>