{"id":8781,"date":"2021-08-17T10:36:25","date_gmt":"2021-08-17T10:36:25","guid":{"rendered":"https:\/\/www.terre-armee.com\/?p=8781"},"modified":"2024-01-23T13:55:39","modified_gmt":"2024-01-23T13:55:39","slug":"wadi-al-qawr-motorway","status":"publish","type":"post","link":"https:\/\/www.terre-armee.com\/wadi-al-qawr-motorway\/","title":{"rendered":"Wadi Al Qawr motorway"},"content":{"rendered":"
Terre Arm\u00e9e was involved in this major project to build a motorway to link the Wadi Al Qawr region to the road between Al Hibab and Nazwa in the north-east of the UAE: \nThis amazing and impressive design-and-build project is already benefiting the economic development of the region and opening up areas previously challenging in terms of access.<\/p>\n<\/div>
\n113,000 m\u00b2 of retaining walls and more than 6,000 m\u00b2 of TechSpan\u00ae prefabricated arches<\/strong>.\u00a0<\/p>\n